Low Sulphur CPC Calcined Petroleum Coke 1-5mm
Brand HQ
Product origin Gansu,Inner Mongolia
Delivery time 7-15 days
Supply capacity 120,000tons
Calcined Petroleum Coke is mainly used for metallurgy & foundry, it can improve the carbon content in steel-melting and casting, Also it can increase the quantity of scrap steel and reduce the quantity of pig iron, or use no scrap iron at all. Low Sulphur CPC Calcined Petroleum Coke 1-5mm also can be used for brake pedal and friction material.
Products Description
Type | Fix carbon (min. %) | Sulphur (max. %) | Ash (max.%) | Volatile matter (max. %) | Moisture (max.) | Size (mm) |
HQ-CPC-01 | 98.5 | 3 | 0.5 | 1 | 0.5 | 0-2 |
HQ-CPC-02 | 98.5 | 1.5 | 0.5 | 1 | 0.5 | 2-5 |
HQ-CPC-03 | 98.5 | 1 | 0.5 | 1 | 0.5 | 5-10 |
HQ-CPC-04 | 98.5 | 0.6 | 0.5 | 1 | 0.5 | 10-25 |
Special particle size can be customized according to your requirement. |
Low Sulphur CPC Calcined Petroleum Coke 1-5mm also could be called Carbon additive, which is made from well-selected petroleum coke which is low in content of ash, sulfur, phosphorus, high heat productivity, high chemically activation.
1. Low Sulphur CPC Calcined Petroleum Coke 1-5mm Mainly used in steelmaking in electrical stove, can improve the carbon content in steel-melting and Ductile iron foundry.
2. Reduce the cost of steelmaking effectively by replacing the traditional carburant
3. Metallurgy , casting for glass production/graphite crucible/anodes for the aluminium, titanim smelting industry.
Product packaging
Our Factory
Certificate and test report
Exhibition
Customer Photos
FAQ
Q1: Can I have a sample order?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q2: What about the lead time?
A: Sample needs 1-3 days, mass production time usually needs 15-20 days.
Q3: Do you have any MOQ limit?
A: Low MOQ, 2000g for samples, and 20 tons for an normal order, checking is available.
Q4: How do you ship the goods and how long does it take to arrive?
A: We usually ship samples by DHL, UPS, Fedex, TNT or airline , it usually takes 3-7 days to arrive.
Mass orders usually go by sea.
Q5: How to proceed an order?
A: Firstly please tell us your requirements, secondly we quote for you, thirdly customer confirms the samples and places deposit for formal order, fourthly we arrange the production.
Q6: Is it OK to print my LOGO on product package?
A: Yes. Please inform us formally before our production and confirm the design firstly based on our sample
Q7: How to deal with the faulty?
A: Firstly, our products are produce in strict quality control system and the defective rate will be less than 0.01%. Secondly, during the guarantee period, we will send new lights with new order for small quantity. For defective batch products, we can discuss the solution including compensate for customer losses.