Steelmaking Gray Iron Production Calcined Pet Coke
  • Steelmaking Gray Iron Production Calcined Pet Coke
  • Steelmaking Gray Iron Production Calcined Pet Coke
  • Steelmaking Gray Iron Production Calcined Pet Coke
  • Steelmaking Gray Iron Production Calcined Pet Coke
  • Steelmaking Gray Iron Production Calcined Pet Coke
  • video

Steelmaking Gray Iron Production Calcined Pet Coke

Brand HQ

Product origin Gansu,Shandong

Delivery time 7-15 days

Supply capacity 150,000tons

Recommend other inorganic fluorine chemical products:
1. calcined petroleum coke powder / granular
2. Graphite Petroleum Coke/Graphitized Petroleum Coke
3. coke powder / granular
4 Steelmaking Gray Iron Production Calcined Pet Coke

Steelmaking Gray Iron Production Calcined Pet Coke

Products Description

Calcined petroleum coke (CPC) has a sponge-like structure which plays an important role in the making of anodes. The pores allow binding material to penetrate through the coke particles and form a solid carbon block, through which aluminum smelters conduct electricity into their smelting pots. Over time, the anodes are consumed, roughly at the rate of 40 tons of calcined petroleum coke (CPC) for each 100 tons of aluminum produced. Currently, there is no known commercially viable substitute for calcined petroleum coke in the fabrication and utilization of aluminum smelter anodes.


Type
F.C
S
Ash
V.M
Moisture
(%)min
(%)max
(%)max
(%)max
(%)max
CPC-01
98
2
1
1
0.5
CPC-02
98.5
0.7
0.8
0.7
0.5
CPC-03
98.5
0.5
0.5
0.5
0.5

industrial grade CPC


Product packaging

Iron Casting CPC


Certificate and test report

Steelmaking Calcined Pet Coke


Exhibition

industrial grade CPC


Customer Photos

Iron Casting CPC


FAQ

Q: Your specifications on Alibaba do not fully meet our demands.

A: We have various resources about the raw materials, and some of them can be customized. Please let us know for any special demands.


Q: Can I get some sample for quality testing before placing an order?

A: Surely the sample (within 2kg) is free and available for your testing, and the express cost will be paid at your side.


Q: I need third party inspection before shipping, can you arrange?

A: For each lot, we record the test results and keep the samples for 6 months. We welcome third party inspection such as SGS, AHK etc.


Q: How about delivery lead time?

A: It depends on the quality and item. In general it takes 5-10 working days for preparing 300mt. Meanwhile, please let us know if the order is in urgently required and we will take special care.


Warm reminder:

The price on Alibaba is only a rough offer and the actual price will be influenced by the changeable market, the chemicals, exchange rate and required quantity etc. Kindly please.

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right